Machine Systems

Plastic Raw Material Drying Times and Temperatures

Plastic Raw Material Drying Times and Temperatures

BSBotex Engineering Team··6 min read
Plastic Raw Material Drying Times and Temperatures

Drying plastic raw material is a critical step to maintain product quality and increase production efficiency. Selecting the wrong drying time and temperature inevitably leads to moisture-related defects and equipment failures.

1. How to Calculate Drying Time?

The moisture content of plastic granules varies according to the type of resin and storage conditions. As a rule of thumb, moisture above 0.2 % can cause production defects. Follow these steps to determine the proper drying time:

  • Moisture Analysis: Measure sample moisture with a %HR (Humidity Ratio) analyzer.
  • Target Moisture: Aim to reduce the moisture level to 0.02‑0.03 %.
  • Thermal Properties: Consider the resin’s melt temperature and thermal stability.
  • Trial Run: For a new material, schedule a 2‑3 hour trial and re‑measure the moisture.

2. Selecting the Correct Temperature

Temperature influences both drying speed and material integrity. The table below summarizes the recommended temperature ranges for common plastics:

Polymer Type – Recommended Temperature Range

  • Polypropylene (PP): 80‑100 °C
  • Polyethylene (PE): 70‑90 °C
  • Polycarbonate (PC): 110‑130 °C
  • ABS: 80‑95 °C
  • Polyester (PET): 120‑150 °C

Related Service

For more details or a free on-site assessment, check out our related service page or get in touch with us.

Frequently Asked Questions

How is the drying time for plastic raw material determined?+

First measure the material’s moisture content, then set the drying time based on trial runs to achieve a target of 0.02‑0.03 % moisture.

What temperature ranges are recommended for different polymers?+

Polypropylene 80‑100 °C, Polyethylene 70‑90 °C, Polycarbonate 110‑130 °C, etc., each polymer has its own recommended range.

What influences the price of a drying system?+

Capacity, energy efficiency, control options, and integration ease affect cost; request a quote from the supplier for specifics.

Free On-site Survey

Get a Quote for Your Line

Leave your details and our engineer will call you within 24 hours. The survey is free, no prepayment.

Monday–Friday 09:00–18:00

Your details are only used to contact you.