Machine Systems

Common Mistakes in Plastic Raw Material Dosing

Common Mistakes in Plastic Raw Material Dosing

BSBotex Engineering Team··6 min read
Common Mistakes in Plastic Raw Material Dosing

Plastic raw material dosing systems are a critical step that directly influences production quality and efficiency. However, simple mistakes in these systems can lead to increased costs and reduced product quality. Here are the common errors and how to avoid them.

1. Incorrect Calculation of Dosing Quantity

The most frequent cause of dosing errors is miscalculating the amount of raw material. This issue becomes evident when working with materials of varying density and viscosity. Follow these steps to set the correct dosing amount:

  • Measure the material’s density and viscosity in a laboratory setting.
  • Define the line speed and output requirements of the production line.
  • Periodically check the calibrations of the dosing equipment; a three‑month interval is recommended.

2. Sensor and Control Unit Mistakes

Improper placement or malfunctioning sensors cause dosing inaccuracies. Optical and capacitive sensors, in particular, are vulnerable to dust, moisture, and contamination. To prevent these issues:

  • Equip sensors with protective covers and establish a regular cleaning schedule.
  • Keep the control unit’s firmware up to date; new releases contain bug fixes.
  • Activate alarm systems to instantly notify operators when a fault occurs.

3. Inconsistent Raw Material Storage and Feeding

Improper silo filling, air pockets, and blockages disrupt dosing precision. Mitigate these problems by:

  • Filling silos evenly and minimizing air gaps.
  • Adjusting conveyor incline and speed; overly steep angles damage flow.
  • Implementing periodic maintenance and cleaning programs to reduce blockage risk.

5 Core Rules for Accurate Dosing

  • Calibration: Perform device calibration every three months.
  • Material Properties: Keep density and viscosity data current.
  • Sensor Care: Clean regularly and use protective measures.
  • Software Updates: Track firmware releases.
  • Storage Management: Fill silos evenly and avoid air pockets.

Related Service

For more details or a free on-site assessment, check out our related service page or get in touch with us.

Frequently Asked Questions

How often should calibration be performed on a dosing system?+

Calibration should be done at least every three months, or monthly under heavy usage.

How can I detect sensor failures early?+

Monitor sensor output signals via SCADA to instantly spot any anomalies.

What are the main factors that affect the price when requesting a quotation?+

Project capacity, custom integration needs, installation and maintenance services are the primary cost drivers.

Free On-site Survey

Get a Quote for Your Line

Leave your details and our engineer will call you within 24 hours. The survey is free, no prepayment.

Monday–Friday 09:00–18:00

Your details are only used to contact you.