Automation Panel

PLC and Inverter Integration — Smart Production Line Control

Automation Panel

Automation panels are control systems that allow production lines to operate fully automatically through PLCs (Programmable Logic Controllers) and frequency inverters. They allow complex production processes to be managed through simple operator interfaces.

Siemens S7, Allen-Bradley and Mitsubishi PLC systems are used in Botex System automation panels. Each panel is programmed according to customer requirements; start/stop sequences, alarm management, data recording and remote monitoring functions can be customized.

Automation panels offering critical advantages in terms of energy efficiency, production quality and machine life are widely used in food, chemical, plastic and heavy industry sectors.

Automation Panel Features

  • PLC-based fully automatic production line control
  • HMI touchscreen integration
  • Speed control and energy savings with frequency inverter
  • Real-time alarm management and logging
  • Remote access and SCADA integration

Technical Specifications & Standards

All our services are delivered in compliance with international standards

Certificates

CE Marking
IEC 61131-3 PLC Programming Standard
ISO 13849 Safety Standard
TSE Electrical Panel Standard

Specifications

IP54 - IP65 Protection Class
Siemens / Allen-Bradley / Mitsubishi PLC
Ethernet/IP + Profibus + Modbus
-10°C / +50°C Operating Temperature

Compliance

Machinery Directive 2006/42/EC
EMC Directive 2014/30/EU
LVD Directive 2014/35/EU
IEC 62061 Functional Safety

Frequently Asked Questions

Questions and answers about Automation Panel

What is the difference between an automation panel and a classic electrical panel?+
While classic electrical panels serve energy distribution and protection functions, automation panels automatically manage production processes thanks to PLC, HMI and inverter integration. Automation panel offers smart functions such as programmable logic, conditional control, data recording and remote monitoring.
Which PLC brands do you work with?+
We work with Siemens S7-1200/1500, Allen-Bradley (Rockwell), Mitsubishi, Schneider Modicon and Omron PLC systems. We recommend the most suitable PLC brand according to the customer's existing infrastructure and technical requirements. We also have experience in foreign brand PLC renewal and migration projects.
How long does an automation panel project take to complete?+
Although it varies depending on the project scope, a typical automation panel project is completed within 4-10 weeks. This period covers needs analysis, software development, manufacturing, factory acceptance test (FAT) and field commissioning phases. For large-scale projects, a detailed project plan is shared.
Can you integrate an automation panel into my existing production line?+
Yes, integrating automation systems into existing machines and production lines is our area of expertise. We design compatible solutions with existing equipment by making a preliminary inspection on site and commission with minimal disruption to production.
What to do when an automation panel breaks down?+
We provide 24/7 technical support to Botex System customers. We quickly diagnose and resolve most breakdowns via remote connection. In cases requiring on-site intervention, we send a technician to Istanbul and surrounding provinces within 4 hours. Thanks to our spare parts stock, critical part replacement can be carried out on the same day.

Let's Plan Your Project Together

Contact us for free site visit and technical consultancy.

Get in Touch